Dear All
I have concern about inspection and testing according to 17th addition which will be forced after 1st of July 2008.
My concern is that every circuit will be protected by RCD. This means that most of the distribution box will be changed or it may require full rewiring. As we all know that RCD is a very sensitive device and it may trip very easily if you add to the existing old wiring. I just wanted to share my thought whether I am right or wrong.
Many Thanks
samil
I have concern about inspection and testing according to 17th addition which will be forced after 1st of July 2008.
My concern is that every circuit will be protected by RCD. This means that most of the distribution box will be changed or it may require full rewiring. As we all know that RCD is a very sensitive device and it may trip very easily if you add to the existing old wiring. I just wanted to share my thought whether I am right or wrong.