YOUNG4R
6th June 2007, 09:45 PM
new at this guys, excuse the lack of equittte
I have a question if anyone can help.
Designing a construction site install with feed from a TN.s Mains supply. I am planning to install 230 volt RCD Protected feeds to supply office porta cabins. I have been told, as part of the install I should Bond all the extranous metal workwork that is around the compound sorrunding the portacabins (i.E harris fencing). however, not sure how this works, Cos surely,If I Bond this metal work does this not create a different potential to the ground creating a shock risk for any one in contact with them both? Or am I being thick Any one put me straight?
:mrgreen:
I have a question if anyone can help.
Designing a construction site install with feed from a TN.s Mains supply. I am planning to install 230 volt RCD Protected feeds to supply office porta cabins. I have been told, as part of the install I should Bond all the extranous metal workwork that is around the compound sorrunding the portacabins (i.E harris fencing). however, not sure how this works, Cos surely,If I Bond this metal work does this not create a different potential to the ground creating a shock risk for any one in contact with them both? Or am I being thick Any one put me straight?
:mrgreen: